Sorry, there was an error
Sorry, there was an error
Country Music Forums @ CountryMusicPerformers.com

Floor coverings technical requirements - Country M...

Please login or register free to be able to post.

View forum:

Floor coverings technical requirements

Started by meishengchao, 2015/07/01 10:55PM
Latest post: 2015/07/01 10:55PM, Views: 147, Posts: 1
Floor coverings technical requirements
#1   2015/07/01 10:55PM
meishengchao
1) the construction must first make moisture, pest control treatment. First sprinkle insect powder, holes and moisture-proof paper (film). Moisture-proof paper (film) are overlapped to 20CM above, and shall be spread over the foot of a wall 10CM.
2) When using the keel laying method must be dry keel and accessories, you can not use low-quality, pollution, humidity, perishable, easy-moth material for the keel and accessories, otherwise not construction.
First ground leveling (ground height difference is too large, should be leveled skids, used between the keel and the keel hammer drill or nail Method wooden keel fixed on the ground. Keel and the wall or other flooring are leaving the pitch 5-10MM.
If the ground water or heating facilities, take keel laying, the bone should be replaced by steel, aluminum and other new keel or adhesive bonding short wooden keel.
After laying the keel should check the flatness and solid, if not flat or weak, can not lay the floor.
3) When using plywood (thick plywood) laying plywood thickness of more than 9MM, plywood is best treated with anti-corrosion paint for corrosion protection. Sawn plywood 60CMx120CM size; leave a gap between the plywood and the plywood 20MM or so, and nailed to the ground.
Before laying on the floor to ensure a recognition of the six do not shop:
Construction workers laying before laying process should be described in detail, the user must be authorized reemplazos listones de madera para los bancos de jardín.
If you encounter the following, not construction, but the user must explain and state the reasons:
1) The ground does not dry (wet), not clean, not construction;
2) Ambient termites, not construction;
3) construction site cross-mixing operations, not construction;
4) poor quality, pollution, humidity, perishable material for the keel, and antideslizante decking tratamiento en eBay, not construction;
5) The construction period is too short. Unable to implement the process, not the construction (consultation requirements except overtime);
6) The user requires absolutely flat, no color, no construction.


Please login or register free to be able to post.

« Go back to topic list

  • Links allowed: yes
  • Allow HTML: no
  • Allow BB code yes
  • Allow youTube.com: yes
  • Allow code: yes
  • Links visible: no
  • Quick reply: yes
  • Post preview: yes