Sorry, there was an error
Sorry, there was an error
Country Music Forums @ CountryMusicPerformers.com

Construction wood flooring attention to detail - C...

Please login or register free to be able to post.

View forum:

Construction wood flooring attention to detail

Started by wangkiky, 2015/08/24 04:44AM
Latest post: 2015/08/24 04:44AM, Views: 173, Posts: 1
Construction wood flooring attention to detail
#1   2015/08/24 04:44AM
wangkiky
Solid wood flooring cool, feel good features make the bedroom, living room, study, etc. ideal material for floor decoration, then flooring the wrong way process which should avoid it? Keel laying to the more common method, for example, there are the following: Not as ground leveling process: cause some uneven ground floor and keel vacant,marine waterproof construction materials it will beep when the stampede. Without making wooden keel moisture treatment: construction now usually used pine plate made of non-dried sawn planing keel, about 30 days ahead of time fixed in between the ground floor and keel laying is not a vapor barrier. When pavement floor, do not check the moisture content of the keel laying directly.

In fact, when the keel moisture content is usually around 25%, and eligible wooden floor moisture content is generally about 12%, humidity difference over the General Assembly so that the wood floor quickly absorb moisture, causing the floor bagging accompanied paint burst phenomenon. Wooden keel fixed with nails: nail construction with playing wedge plus a fixed manner, will cause the wedge with nails because the contact surface is too small leaving insufficient nail holding power, it can easily cause the wood keel loose, when he stepped on the floor It appears sound. Assembling too loose or too tight: wood expands and contracts along with changes in ambient temperature, humidity changes.

Thus, in the development of wooden floor coverings programs should be based on the ambient temperature of use of premises and humidity level to rationalize assembly tightness wooden floors. If too loose, the floor will be a large gap shrink, too tight, it will inflate the floor when bagging. Cross renovation construction: the construction of the first paved flooring and other construction projects in the floor surface, which is common practice in the renovation team. Thus, after completion of floor coverings, often they need to go through a month or even longer to polish paint. In the meantime, the floor and the water installation price railing per foot compositevapor surrounding environment, chemicals no quarantine measures, is likely to lead to the wooden floor drastic changes due to moisture deformation and cracking.By the impact of European decor, coupled with the current most-storey house is limited, many consumers in the purchase of the floor are no longer blindly follow the popular market 10cm, 8 cm baseboard standard, dwarfing 6 cm skirting gradually More and more consumer choice, but also will become a fashion for the future, in addition, 6 cm skirting also renovated to add more personality factors, great to meet the individual needs of the modern consumer.


Please login or register free to be able to post.

« Go back to topic list

  • Links allowed: yes
  • Allow HTML: no
  • Allow BB code yes
  • Allow youTube.com: yes
  • Allow code: yes
  • Links visible: no
  • Quick reply: yes
  • Post preview: yes