Locking floor preparation before installation - Co...
Please login or register free to be able to post.
View forum:
Locking floor preparation before installation
Started by
wangkiky,
2017/10/24 10:37PM
Latest post: 2017/10/24 10:37PM, Views: 109, Posts: 1
Latest post: 2017/10/24 10:37PM, Views: 109, Posts: 1
wangkiky
Install the ground before the need to be clean, dry, stable, smooth, before the installation to make up for irregularities. If you want to do in the concrete floor, the wooden keel shop with a wooden screw to the wood keel core plate fixed smooth and solid,деревянная крыльцо язычка and between the board and the board reserved 8mm telescopic gap (door and the mouth please do not stay expansion joints) And finally to the smooth dry and no noise can be. In order to achieve better results, the floor can be paved with most of the light outside the window.
Door and door cover and wood floor connection: the door and the door under the reserved wood floor thickness, the door reserved below 14mm,дома с теплоизолированными стенами the following set aside l2mm. Door and stone, wall and plastic steel door connection: According to the relevant provisions of the composite wood flooring in the construction process around the wooden floor reserved 8mm telescopic gap, with the marble and steel doors need to install a special buckle, with the wall When connecting the body, you need to install the baseboard.
Floors should be reserved for 8-12 mm around the floor; the floor is parallel to the light. Cut the lower part of the door, so that the floor along all the walls are left with 10mm expansion joints. Laying moisture-proof film, between the two films required to overlap 20cm,листы из силиката натрия meet the wall requirements higher than 5cm.
When installing the floor, lay along the direction of the light into the window. Check whether the wall is straight, starting from the right hand corner,декоративные внутренние панели the groove toward the room, the first line of the remaining material can be used for the next line of the beginning. If the wall is very uneven, you can draw this uneven line on the floor.
Door and door cover and wood floor connection: the door and the door under the reserved wood floor thickness, the door reserved below 14mm,дома с теплоизолированными стенами the following set aside l2mm. Door and stone, wall and plastic steel door connection: According to the relevant provisions of the composite wood flooring in the construction process around the wooden floor reserved 8mm telescopic gap, with the marble and steel doors need to install a special buckle, with the wall When connecting the body, you need to install the baseboard.
Floors should be reserved for 8-12 mm around the floor; the floor is parallel to the light. Cut the lower part of the door, so that the floor along all the walls are left with 10mm expansion joints. Laying moisture-proof film, between the two films required to overlap 20cm,листы из силиката натрия meet the wall requirements higher than 5cm.
When installing the floor, lay along the direction of the light into the window. Check whether the wall is straight, starting from the right hand corner,декоративные внутренние панели the groove toward the room, the first line of the remaining material can be used for the next line of the beginning. If the wall is very uneven, you can draw this uneven line on the floor.
Please login or register free to be able to post.
- Links allowed: yes
- Allow HTML: no
- Allow BB code yes
- Allow youTube.com: yes
- Allow code: yes
- Links visible: no
- Quick reply: yes
- Post preview: yes